A PHP Error was encountered

Severity: Warning

Message: Division by zero

Filename: drivers/Session_cookie.php

Line Number: 812

Paropakar Primary Health Care Centre • Projects
LGCDP Programe at Chaubas, Kavre Koshipari Field Visit LGCDP & Library  Programe Drinking Water Project Library Handover Thakur L.S. School Koshipari Field Visit LGCDP & Library  Programe Interaction With DEO & RP's in  Kavre PPUK AGM at Dhulikhel, Kavre
Work For People, Serve The Poor
  • facebook.png
  • linkedin.png
  • twitter.png
  • youtube.png
"Work For People, Serve The Poor"
"Work For People, Serve The Poor"

Project


 

Project Name/Country: People's Water Supply & Sanitation Programme-Nepal (Completed Project)
Team Leader of the Project: Padam Dulal Funding Agency (ies): UNDP (World Bank, JAKHAPAS)
Project Location : Kavre Project Start Date: 24 Dec, 1993
Name of Client: World Bank, JAKHAPAS Project Completion Date: 23 Dec, 1997
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This is community based project related with water supply and sanitation promotion in rural setting in the project area. The objective of this project was to provide safe drinking water facilities to the rural poor and promote health and hygiene. This project was implemented in 6 different rural VDCs of Koshipari area of Kavre district. These VDCs included: Gothpani, Sarsukharka, Katike Deurali, Nagre Gagarche, Sanu Bangthali and Saramthali. The duration of the project was 4 years.
Nature of the Service Provided: (Tick appropriate number)
(1) Decentralization and Local Governance
(2) Transparency and Accountability (Use of social accountability tools)
(3) Capacity Building
√ (4) Others (Rural Water Supply and Sanitation)
 
 
 Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
  (2) Joint-venture Institution
  (3) Associate Institution
 
 
 
 
  Total Budget (NRs): 23,08,050
Program cost Service cost
 NRs 1961843  NRs 346207.5
 
 
Project Name/Country: Community Tile Development Project/Nepal (Completed Project)
Team Leader of the Project: Indra Bdr Tamang Funding Agency (ies): IUCN
Project Location :  Kavre Project Start Date: 1st  Feb,1995
Name of Client: IUCN-Nepal Project Completion Date: 1st Feb, 1996
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This community tile development project was launched at Chukhabesi of Saramthali VDC of Kavre district. This project is entirely community-based project. The objectives of the project were to introduce tiles based sustainable housing systems/technologies by replacing existing hut roofs and provided support in community environment conservation initiatives in the project area. The duration of the project was 1 year.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
  (2) Transparency and Accountability (Use of social accountability tools)
  (3) Capacity Building
√ (4) Others (Tile based technology intervention)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
  (2) Joint-venture Institution
  (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 231,836
Program cost Service cost
 NRs 197061  NRs 34775
 
Project Name/Country: Water Supply and Sanitation Project/Nepal (Completed Project)
Team Leader of the Project: Padam Dulal Funding Agency (ies): UNDP [Partnership in development Project, PDP]
Project Location : Kavre Project Start Date: 1998
Name of Client: UNDP [Partnership in development Project, PDP] Project Completion Date: 1999
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This project was launched on demand driven approach for providing managed and hygienic water for community people. It was implemented at Sanu Bangthali VDC-2 of Kavre district. The duration of the project was 1 year.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
  (2) Transparency and Accountability (Use of social accountability tools)
  (3) Capacity Building
√ (4) Others (Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
  (2) Joint-venture Institution
  (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 236600
Program cost Service cost
 NRs 201110  NRs 35490
 
Project Name/Country: Community Environment Improvement through Forest Management Project (Completed Project).
Team Leader of the Project: Manohar Karki Funding Agency (ies): Keidanren Nature Conservation Fund (KNCF)-Japan
Project Location : Makwanpur Project Start Date: June 2000
Name of Client: Keidanren Nature Conservation Fund (KNCF) Project Completion Date:  May 2005
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
Community Environment Improvement through Forest Management Project was implemented at Chhatiwan VDC of Makawanpur district of Nepal. The duration of the project was 3 years. The project objectives included to: promote and generate enormous energy of local forest; to protect community environment enhanced involvement of community people and to launch environmental awareness program and deliver environmental education to the community at local levels.
Nature of the Service Provided: (Tick appropriate number)
    (1) Decentralization and Local Governance
    (2) Transparency and Accountability (Use of social accountability tools)
    (3) Capacity Building
√  (4) Others ( Environment Conservation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 2034325
Program cost Service cost
 NRs 1756825  NRs 277500
 
Project Name/Country: Rural water supply  & sanitation project: Batch – I / Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre Project Start Date: 2053/10/19
Name of Client: RWSSFDB Project Completion Date: 2055/6/11
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Chaubas, Bekhasimle, Gothpani and Sanubangthali VDCs of Kavre district.
 
Objective:
  •   Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  •  To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  •  To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others (Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs):  1591099
Program cost Service cost
 NRs 1356252  NRs 234845.5
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch – II/Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre Project Start Date:  2054/12/15
Name of Client: RWSSFDB Project Completion Date:  2056/09/21
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Chaubas, Saping, Sanubanthali, Simthali, Dhuseni- VDCs of Kavre district.
 
Objective:
  •  Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  •  To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  •  To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 9450556
Program cost Service cost
 NRs 8237529  NRs 1213027
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch – III/Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre & Makwanpur Project Start Date:  2056/02/23
Name of Client: RWSSFDB Project Completion Date:  2058/06/01
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Madankundari, Devbhumi, Baluwa, Panchkhaal – VDCs of Kavre and Chhatiwan VDC of Makawanpur
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 13838152
Program cost Service cost
 NRs 12284464  NRs 1553688
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch – IV/Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Makwanpur Project Start Date: 2057/10/05
Name of Client: RWSSFDB Project Completion Date:  2059/12/01
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Dumre phaparbari, Ambanjyang, Bairab danda, Dahidamar VDCs of Makawanpur
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 10520452
Program cost Service cost
 NRs 9329419  NRs 1191033
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch –V/Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre Project Start Date: 2061/01/18
Name of Client: RWSSFDB Project Completion Date:  2062/12/30
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Balthali, Khyaku danda and Anaikot VDCs of Kavre
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 2134909
Program cost Service cost
 NRs 1814673  NRs 320236.4
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch –VI /Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre Project Start Date: 2063/1/05
Name of Client: RWSSFDB Project Completion Date:  2064/03/22
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Chune Ghupha, Mane Danda, Bakhreldihi, Mathurekamarecot VDCs/scheme of Kavre.
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 7145031.27
Program cost Service cost
 NRs 6073277  NRs 1071755
   
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch –VII /Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre & Ramechhap Project Start Date: 2065/01/20
Name of Client: RWSSFDB Project Completion Date:  2066/08/09
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Madanbas, Ghampekhola, Dandagun, Chasingkharka VDCs/scheme of Kavre and Lakhanpur, Salimekhola, Madanbas VDCs/scheme of Ramechhap.
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 12811731.40
Program cost Service cost
 NRs 10889972  NRs 1921760
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch –VIII /Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre & Ramechhap Project Start Date: 2066/04/01
Name of Client: RWSSFDB Project Completion Date:  2066/11/29
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Darga Satdhara, Lophra Bhirmuni,  VDCs/scheme of Ramechhap and Ryaletar, Mahabhir Chhanga, Surke Prathala,Gattekhola,Dhikurikhola VDCs/scheme of Kavre.
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 15489091
Program cost Service cost
 NRs 13165727  NRs 2323364
                                        
 
Project Name/Country: Rural water Supply  & Sanitation Project:  Batch –IX /Nepal (Completed Project)
Team Leader of the Project: Suni Lama Funding Agency (ies): RWSSFDB
Project Location : Kavre, Ramechhap and Dolakha Project Start Date: 2068/05/30
Name of Client: RWSSFDB Project Completion Date: 2069/01/27
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This rural community based water supply and sanitation improvement project is Community Based  Programme which emphasizes on community participation on different project activities, people orientation, initiates community endeavor for development efforts, based on demand driven approach and community ownership. This project is highly introduced at village community and remote areas through the country. This project was implemented in Dovan Khola,Chisapani,Bulbule VDCs/scheme of Kavre, Stovir Chhanga, Sailungeshwori, Augleshwori VDCs/scheme of Ramechhap and Jimbukhola VDCs/scheme of Dolakha.
 
Objective:
  • Manage to provide hygiene fresh and potable drinking water for the rural community in need.
  • To make aware rural women and make their participation on each activities of public health and sanitation and rural environment.
  • To empower rural women and make their participation on each activities of community.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others ( Rural Water Supply and Sanitation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 20493533
Program cost Service cost
 NRs 17419503  NRs 3074030
 
Project Name/Country: Community Forest and Bio-diversity conservation through Local Initiation (Ongoing)
Project Coordinator: Manohar Karki Funding Agency (ies): Keidanren Nature Conservation Fund-Japan (KNCF)
Project Location : Kavre Project Start Date:  June, 2004
Name of Client: Keidanren Nature Conservation Fund-Japan (KNCF) Project Completion Date:   Ongoing)
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This project is community based project being implemented at Chaubas and SanuBanthali VDCs of Kavre.
Project Objectives:
  • To promote and generate the enormous energy of local forest consumer's committee quite strongly.
  • To protect community environment through making involvement of community people.
  • To launch environmental awareness program and to deliver environmental education to the community people.
  • To aware local people for the conservation of forestry and local bio-diversity.  
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others (Community Forest and Biodiversity Conservation)
 
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
 
 
 
  Total Budget (NRs): 805000
Program cost Service cost
 NRs 725500  NRs 79500
 
Project Name/Country: Library For Rural School Project/Nepal (Ongoing)
Project Coordinator: L. B. Khadga Funding Agency (ies): Room to Read, Nepal
Project Location : Kavre Project Start Date:  1st Jan, 2009
Name of Client: Room to Read, Nepal Project Completion Date:  Ongoing
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This is reading promotion based project which emphasis to develop reading habit of primary level students by providing different colorful story books and other reading materials. This project in focus in rural area of Kavre district and target group of this project is primary level children of community school. This project has been implemented in different schools of Kavre district.
 
Objective:
  • Develop habit of reading for the primary level children of community school.
  • To create child friendly reading environment in school.
Nature of the Service Provided: (Tick appropriate number)
     (1) Decentralization and Local Governance
     (2) Transparency and Accountability (Use of social accountability tools)
     (3) Capacity Building
√   (4) Others (School Library establishment
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
  Total Budget (NRs): 1,20,00,000
Program cost Service cost
 NRs 1,20,00,000  NRs 00
 
PPUK has already completed Community Based Water Supply and Sanitation Projects from 2006-2010  in Dadeldhura,
Bajhang and Doti  districts on funding  of CWSS/ Asian Development Bank (Completed Projects).
 
(ii) Specific work experience
Project Name/Country:  Local Governance and Community Development Program (LGCDP) (Ongoing)
Program Coordinator: Miss. Safala Tamang Funding Agency (ies): DDC, Kavre
Project Location :  Kavre Project Start Date:   2067/12/21
Name of Client: DDC, Kavre Project Completion Date:  On Going
Worked with Local NGOs/CBOs (If yes, please mention the names of NGOs/CBOs): None
Type and detailed narrative description of the project:
This Local Governance and community development program is interlay community mobilization and empowering program through the reflect classes in Citizens Awareness Centre (CAC). This program forms Ward Citizen Forum to make function of Ward committee and WCF look after all development activities of the village.
 
Objective:
  • To empower the people through Reflect classes.
  • To make people participation in each and every step of development process in village.
Nature of the Service Provided: (Tick appropriate number)
√  (1) Decentralization and Local Governance
    (2) Transparency and Accountability (Use of social accountability tools)
    (3) Capacity Building
    (4) Others (School Library establishment
 
 
 
Whether the Institution provided service as: (Tick appropriate number)
√  (1) Lead Institution
    (2) Joint-venture Institution
    (3) Associate Institution
 
 
 
  Total Budget (NRs): 18,00,000
Program cost Service cost
 NRs 1620000  NRs 180000